Projects
BC Cancert Agency Centre
Client: PCL Construction
Key Personnel: Terry Fjellstrom
L&M Engineering Limited was a member of a design-build team contracted to design and construct a 5000 m2 Cancer Centre and 31/2 storey cast in place concrete parkade. The building was designed to conform to LEED Gold standards.
L&M Engineering was responsible for the site servicing, site grading, parking lot design and development of an erosion and sedimentation control plan. To meet LEED objectives for stormwater management and treatment, L&M designed a stormwater exfilltration system that allowed the storm water to be discharged to the native soils rather than the City municipal system.